QS Mentor Knowledge Centre
The everyday work of a contractor's QS, explained plainly: what to check, in what order, and why. Each guide links to a task you can practise on QS Mentor.
Payment applications & certification
- How to assess a subcontractor payment application (IPA), step by step
How to check subcontractor payments: a practical checklist for Graduate QSs to test every line of an IPA against the JMS, BOQ, inspection records and VO register, then prepare the IPC.
- IPA vs IPC: interim payment application and certificate explained
What an IPA and an IPC are under a subcontract and under a FIDIC main contract, who prepares each, how the figures flow, and a worked example of IPC preparation in construction.
- Retention money and advance payment recovery: how to calculate them
Retention money calculation in construction: cumulative retention, the retention limit, what to deduct this certificate, and how an advance payment is recovered, with worked numbers.
Measurement & BOQ
- Joint measurement (JMS) and WIRs: quantity surveying site measurement records
Quantity surveying site measurement: what a joint measurement sheet is, how inspection records and the cut-off date affect what is valued, and how a QS uses both to check a claimed quantity.
- POMI vs NRM2 vs CESMM4: quantity surveying measurement standards compared
The measurement standards a Gulf QS meets: POMI for building, NRM2 in UK practice, CESMM4 mostly for infrastructure, and why the BOQ preambles decide how each is applied on your project.
Variations, claims & FIDIC
- Valuing variations under FIDIC 1999 and 2017: a variation assessment example
FIDIC variation assessment: the right to vary, Engineer’s instructions, the variation procedure, and how the evaluation provisions decide between contract rates, adjusted rates and new rates.
- Extension of time and claims under FIDIC 2017: the 28-day notice and 84-day claim
How a Contractor’s claim works under FIDIC 2017 Sub-Clause 20.2: Notice of Claim, the Engineer’s 14-day response, the fully detailed Claim, late submissions, and how it differs from FIDIC 1999 Sub-Clause 20.1.
QS career & interviews
- The QS interview take-off test: a graduate quantity surveyor practical test
How to approach the graduate quantity surveyor practical test many interviews include: read the notes, set out a dimension sheet, apply the stated deduction rules and check your totals.
- Graduate QS in the UAE: quantity surveying practical training employers expect
What a contractor expects a graduate quantity surveyor to do in the first months in the UAE and the Gulf, and how practical quantity surveying training builds that experience before your first job.