The QS interview take-off test: a graduate quantity surveyor practical test
Many QS interviews include a short take-off: a plan and an elevation of a small unit, and 30 to 60 minutes to measure a few items. Interviewers are checking method as much as answers.
Read everything first
The notes on the drawing usually tell you the rules: where partitions are measured (often on centreline), the deduction rule for openings, what is excluded (a landlord shopfront, for instance) and finish heights. Most lost marks come from skipping the notes.
Set out a dimension sheet
For each item write: description, location, times, length, width, height, and the result. Show the gross figure, then each deduction on its own line. An interviewer can follow it, and so can you when you check.
Classic traps
- Measuring a shared wall twice, once from each room.
- Deducting small openings the rules say to ignore.
- Forgetting that an opening with a sill (a serving hatch) does not stop the skirting.
- Measuring wall tiling to full height when the specification says 2,400 mm.
- Including work by others.
Check before you hand in
Re-add each column, check units (m, m², m³, nr) and do a rough sense check: floor finishes across all rooms should add up to about the unit area.
QS Mentor includes a café-unit interview take-off with strip-out, partitions, floor and wall finishes, marked line by line. Create a free account.